Friday, May 30, 2008

Fake Yonge St Toronto

Jury final_Modalités-Precision

accordance with what was announced at the last workshop session, the delivery format is the horizontal A1. Feel free to call your board by placing several levels per sheet, create boards attached to dial up a big sign one document of surrender ... Good job to you

Wednesday, May 21, 2008

Can I Shower After Iui

Mock Jury at the 50th

Many of you want to submit a final model complementary to 1:50. Interested students are invited to join this Friday morning, Mayor Claire, Rita Basile for the realization of two bases at 1:50. Any help is welcome. Please come with cardboard cutter, glue, ruler for making white pedestals.

Heather's Friend Brooke

final_Modalités

Filing of the Tuesday, June 3, 2006 between 17:00 to 18:30 in room 102.

Students absent or carry a medical certificate is imperative to file their documents in the state by another person. Absence filing prevents access to the jury.
Attendance mandatory for all students on June 4 at 8:30

DOCUMENTS TO BE SUBMITTED
1) Implementation Plan to 0.5 cm / m plan of the ground floor of the project qualification surrounding areas and public spaces (narrative level) and general profile section;
2) Plans furnished 2 cm / m in all levels of the project with representation from the immediate context or necessary to the understanding;
3) Longitudinal section of 2 cm / m in the project with cuts and / or elevations of neighboring
4) Cross section at 2 cm / m with cuts and / or elevations of neighboring
5) Elevations (all) to 2 cm / m with cuts and / or elevations of neighboring
6) 1 comp 1 cm / m to be installed in models of mass
7) At least 3 internal and 3 prospects prospects External
8) + all that the students deem necessary to promote their project and make it explicit.

- The documents include the following titles (readable and hierarchical division):
- Name of the student
- Unit
- Academic Year
- No exercise and
Title - Date
- Title Plan



EVALUATION CRITERIA 1. Ability to use the results of the analysis and present a personal look at the context to make it explicit and communicable;
2. Capacity building a remark on the classification of urban and architectural dimension, to initiate an attitude;
3. Capacity building of architectural coherence vis-à-vis the above statement about (character, scale, relative to the ground ... ...);
4. Adequacy of the response to the program and its spatialization;
5. Spatial and formal qualities of urban and architectural projects;
6. Qualities of uses, distribution, sizing;
7. Quality of the portfolio.

The jury presidents will ensure that each review / discussion of projects takes place in two stages: A.
Critique / Discussion on items 1. and 2.
B. Critique / Discussion on items 3. 4. 5., 6., 7.

Prepare your oral presentation to specify as clearly as possible these points.
Your presentation can not exceed 10 minutes.
She will be in two stages:
1. General presentation of the party
2. Traffic through the project

Saturday, May 10, 2008

Wearing No Panties In Public

EXE 4 3_Consigne

accordance with the verbal communication of this Friday for the upcoming sessions, the conditions for presentation at the workshop are:
  • presenting all plans, sections and facades (from Wednesday 14 to them) and a model at each session.
  • the scale of 1 / 50 for all documents (except scale model 1 / 100);
  • the context documents (different levels and sections) to Wednesday 14 to 14h in view of these common documents.
For this last point to you to arrange for a display at 14h. The session today will start with this correction.

Tuesday, May 6, 2008

Logitech Eyetoy Usb Camera Driver Sleh-00030

ATTENDANCE TEACHERS BEFORE JURY FINAL EXE

Wednesday, May 7 AFTERNOON
Géry Leloutre

Friday, May 9 MORNING
Mawet Mark Iwan Strauven Denis Pools, Gery Leloutre

Friday, May 9 AFTERNOON
Mawet Mark Iwan Strauven Denis Pools, Gery Leloutre



Wednesday, May 14 AFTERNOON
Mawet Marc Denis Pools

Friday, May 16 MORNING
Iwan Strauven Denis Pools

Friday, May 16 AFTERNOON
Iwan Strauven Denis Pools, Gery Leloutre



Monday, May 19 AFTERNOON
Mawet Mark Iwan Strauven Denis Pools, Gery Leloutre

Friday, May 23 MORNING
Mark Mawet Iwan Strauven Denis Pools, Gery Leloutre

Friday, May 23 AFTERNOON
Mawet Mark Iwan Strauven, Gery Leloutre

Glycerin Based Soaps Acne

3_Consigne 3

Friday 09 MAI 2008 at 12:00
ATTENDANCE COMPULSORY FOR ALL STUDENTS IMPORTANT PAPERS.